Project Castle Quarter, Swansea - Ironmongery Secured.

We have been choosen as the prefrered supplier for all the Ironmongery. Working along side WW Carpentry and Dawnus Construction.

High specification Ironmongery along with the High

Value: 5.1m
Completion Date: June 2014
Contract Period: 62 weeks
Client: Coastal Housing Group

Design and Build contract involving construction of a multi-storey residential development incorporating twenty-six No. 1 and 2 bed rented flats and four, 2 or 3 bed duplex private apartments.

The shell and core ground floor will comprise retail accommodation (1764m) of restaurant and caf use for up to four tenants, a small kiosk (42m) for retail or business use, and a rooftop plant area for commercial tenants. Other works include a car park, external seating areas and associated external works; together with all services and service connections to existing mains supplies.

The building extends to approximately 18 metres above street level on the Castle Square frontage and 32 metres on the Strand frontage. The structural arrangement will be reinforced concrete frame and flat slabs to all storeys with steel framed roof structures.

Close liaison will continue with the local authority and other consultees to ensure that Swansea Castle's historic value is preserved while the development takes place.